Audi A4, S4

since 2000 release

Repair and operation of the car



Audi A4, S4
+ Introduction
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
- Power supply systems, release and decrease in toxicity of the fulfilled gases
   + Power supply systems of petrol and diesel engines
   + System of injection of fuel of the petrol engine
   + System of injection of fuel of the diesel engine
   - Systems of release and decrease in toxicity of the fulfilled gases. Turbocompressor
      Removal and installation of system of release. Replacement of the central, additional muffler, trailer pipe
      Correction of laying of system of release / trailer pipe
      Systems of decrease in toxicity of release - the general information
      Catalytic converter
      Removal and installation of the catalytic converter and lambda probes
      Turbocompressor - the general information and precautionary measures
      Interkuler - the general information
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment






Correction of laying of system of release / trailer pipe

After installation of system of release into place it is necessary to expose correctly it, otherwise there can be tension leading to emergence of cracks and/or noise.

Installation

 PERFORMANCE ORDER

  1. The system of release is installed in a cold state. If system of release hot, it needs to be cooled up to the external temperature.

Lifting operation and installations of the car on supports is connected with danger! Therefore before carrying out operation study Poddomkrachivaniye's Section and towage.

  1. Lift and install the car on supports.
  1. Models with the terminal plug: Weaken bolts of fastening of the terminal plug.
  1. Displace the additional muffler forward (an arrow on an accompanying illustration) so that the preliminary tightness on the right back collar of the additional muffler made and = 7 – 11 mm.
  1. Tighten evenly bolts of fastening of the terminal plug the moment 40nm.

Models with the terminal plug located between preliminary and additional mufflers

The preliminary muffler needs to be exposed only at cars with the terminal plug located between preliminary and additional mufflers.

 PERFORMANCE ORDER

  1. Weaken bolts of fastening of the terminal plug, poses. 22 on the illustration System of Production of the Fulfilled Gases. Engine of 2.0 l of ALT.
  1. Displace system of release forward (an arrow on an accompanying illustration) so that the preliminary tightness on the right forward collar of the preliminary muffler made and = 7 – 9 mm.
  1. Tighten evenly bolts of fastening of the terminal plug the moment 40nm.

Installation of a trailer pipe

 PERFORMANCE ORDER

  1. Trailer pipe establish so that distance "and" at the left it was equal to distance "and" on the right. At the same time the distance from cut under a bumper to a pipe above made "b" = 20 mm.

Diesel engine of 2.5 l

 PERFORMANCE ORDER

  1. Modify the and size as follows: Weaken a nut (the shooter on an accompanying illustration) fastenings of communication between exhaust pipes. Expose exhaust pipes evenly on the center. Tighten a nut the moment 23nm.

Petrol engine of 2.5 l

 PERFORMANCE ORDER

  1. Check distance "and" between a trailer pipe (1) bumper (2). It has to make 40 mm.